  "abstract": "Flexible job-shop scheduling becomes resource-coupled when a scarce vehicle fleet moves jobs between stations, because the schedule sets the transport waits. BOLT (bound-oriented learning for transport-coupled scheduling) builds a lower bound from chain, machine-capacity, and fleet-capacity relaxations. The bound equals the makespan at termination, so its per-step changes form a reward that sums to a constant minus the makespan. Because it never exceeds the attainable makespan, each candidate's bound increase is a proven rise of the makespan floor, which the policy reads as a price. The root bound certifies a completed schedule's suboptimality gap without a solver. On industry-motivated 10-module prefabricated-construction instances, explicit transport coupling outperforms a transport-penalty policy in every tested cell where loaded moves occupy at least 66% of fleet time and in none at or below 56%. Across five zero-shot 50- and 80-module production batches, BOLT outperforms the best dispatching-rule pair on four and the penalty policy on the three with long moves. In the three-vehicle 80-module batch, its mean makespan is 13.0% below the best pair and 4.2% below an hour-budget constraint-programming solver whose proven gap averages 34%. BOLT decides in 2.3-5.9 ms per event on one processor core and re-plans a disruption in seconds.",
  "abstract_shown": true,
  "affiliations": [],
  "article_type": null,
  "arxiv": "2610.22433",
  "author_total": 6,
  "authors": [
    {
      "name": "Ziheng Zhang"
    },
    {
      "name": "Wei Zhang"
    },
    {
      "name": "Yunyi Zhao"
    },
    {
      "name": "Zuming Liu"
    },
    {
      "name": "Wei Zhou"
    },
    {
      "name": "Boon Ping Gan"
    }
  ],
  "bibtex": "https://research.draconitic.com/paper/1afw24tqrchpx.bib",
  "cited_by": 0,
  "doi": "10.48550/arxiv.2610.22433",
  "fulltext_url": null,
  "id": "1afw24tqrchpx",
  "issns": [],
  "landing_url": "https://arxiv.org/abs/2610.22433",
  "language": null,
  "licence": "CC-BY-4.0",
  "licence_label": "CC BY 4.0",
  "licence_source": "article",
  "licence_url": "http://creativecommons.org/licenses/by/4.0/",
  "metadata_licence": "CC0-1.0",
  "native_subjects": [
    [
      "arxiv",
      "cs.LG"
    ],
    [
      "arxiv",
      "math.OC"
    ],
    [
      "openalex",
      "2209|Scheduling and Optimization Algorithms"
    ]
  ],
  "openalex": "W7222959096",
  "pdf_url": "https://arxiv.org/pdf/2610.22433",
  "pmcid": null,
  "pmid": null,
  "published": "2026-10-15",
  "publisher": null,
  "ris": "https://research.draconitic.com/paper/1afw24tqrchpx.ris",
  "sources": [
    {
      "first_seen": "2026-10-30T12:30:37Z",
      "native_id": "2610.22433",
      "source": "arxiv",
      "url": "https://arxiv.org/abs/2610.22433"
    }
  ],
  "subjects": [
    {
      "field": "mathematics",
      "origin": "arxiv:math.OC",
      "subfield": "optimisation-control"
    }
  ],
  "title": "BOLT: Multi-Bottleneck Bound-Guided Learning for Flexible Job-Shop Scheduling with Time Lags and Resource-Coupled Transport",
  "title_text": "BOLT: Multi-Bottleneck Bound-Guided Learning for Flexible Job-Shop Scheduling with Time Lags and Resource-Coupled Transport",
  "type": "preprint",
  "updated_at": "2026-10-30T12:33:31Z",
  "url": "https://research.draconitic.com/paper/1afw24tqrchpx",
  "venue": "arXiv",
  "versions": []
}