  "abstract": "Military installation energy readiness depends on having sufficient resources to sustain mission-critical loads throughout a prolonged utility outage. This paper develops a method to help operators manage energy resources during normal grid-connected operation while preserving islanded readiness. A robust viability kernel identifies combinations of battery energy, fuel, and load-shifting capability sufficient to sustain critical load under uncertain demand and photovoltaic generation. A probability bound translates stochastic generator start failures and recovery into a deterministic generator count selected to meet a specified availability requirement at islanding. Case studies for a fourteen-day islanding requirement at 0.999 islanding-entry availability show that advance warning of an outage can be used to prepare resources to meet a higher readiness requirement before islanding begins. The case studies further demonstrate that economic-only operation and the evaluated fixed battery reserve policy can fail to sustain critical load for the required duration, whereas enforcing the resource-dependent requirement preserves readiness at a modest increase in modeled grid-connected operating cost. These results demonstrate how active resource management can preserve long-duration energy readiness. The framework also helps commanders understand how readiness changes with operating conditions, even when the available resources remain the same.",
  "abstract_shown": true,
  "affiliations": [],
  "article_type": null,
  "arxiv": "2610.40078",
  "author_total": 3,
  "authors": [
    {
      "name": "Aidan Looney"
    },
    {
      "name": "Annie Weathers"
    },
    {
      "name": "Nicholas Judson"
    }
  ],
  "bibtex": "https://research.draconitic.com/paper/857zskge4xsgk.bib",
  "cited_by": 0,
  "doi": "10.48550/arxiv.2610.40078",
  "fulltext_url": null,
  "id": "857zskge4xsgk",
  "issns": [],
  "landing_url": "https://arxiv.org/abs/2610.40078",
  "language": null,
  "licence": "LicenseRef-arXiv-nonexclusive-1.0",
  "licence_label": "arXiv licence",
  "licence_source": "article",
  "licence_url": "http://arxiv.org/licenses/nonexclusive-distrib/1.0/",
  "metadata_licence": "CC0-1.0",
  "native_subjects": [
    [
      "arxiv",
      "cs.SY"
    ],
    [
      "arxiv",
      "eess.SY"
    ],
    [
      "arxiv",
      "math.OC"
    ]
  ],
  "openalex": null,
  "pdf_url": "https://arxiv.org/pdf/2610.40078",
  "pmcid": null,
  "pmid": null,
  "published": "2026-10-29",
  "publisher": null,
  "ris": "https://research.draconitic.com/paper/857zskge4xsgk.ris",
  "sources": [
    {
      "first_seen": "2026-10-30T12:36:32Z",
      "native_id": "2610.40078",
      "source": "arxiv",
      "url": "https://arxiv.org/abs/2610.40078"
    }
  ],
  "subjects": [
    {
      "field": "mathematics",
      "origin": "arxiv:math.OC",
      "subfield": "optimisation-control"
    }
  ],
  "title": "Readiness-Constrained Pre-Islanding Dispatch for Military Microgrids",
  "title_text": "Readiness-Constrained Pre-Islanding Dispatch for Military Microgrids",
  "type": "preprint",
  "updated_at": "2026-11-04T15:20:52Z",
  "url": "https://research.draconitic.com/paper/857zskge4xsgk",
  "venue": "arXiv",
  "versions": []
}