{
  "abstract": "Steel production planning must balance demand and capacity over time while satisfying restrictions on processing and material use. This review examines models and solution approaches for production planning in the steel industry and in downstream equipment manufacturing. The review compares the production decisions, capacity restrictions, and inventories in models for multi-period planning, batching, and material allocation. Multi-period models balance demand, production, and inventories subject to period capacity limits, while batch capacity, product compatibility, and material dimensions restrict batching and allocation decisions. Downstream production and assembly plans determine the quantities and timing of material requirements. Future research could integrate order batching with multi-period production and inventory planning in steel plants. Production at steel plants could also be planned together with production and purchasing at downstream manufacturers.",
  "abstract_shown": true,
  "affiliations": [
    "National Frontiers Science Center for Industrial Intelligence and Systems Optimization, Northeastern University, Shenyang 110819, China",
    "Key Laboratory of Data Analytics and Optimization for Smart Industry, Northeastern University, Ministry of Education, Shenyang 110819, China",
    "Liaoning Engineering Laboratory of Data Analytics and Optimization for Smart Industry, Northeastern University, Shenyang 110819, China",
    "Liaoning Key Laboratory of Manufacturing System and Logistics Optimization, Northeastern University, Shenyang 110819, China"
  ],
  "article_type": null,
  "arxiv": null,
  "author_total": 4,
  "authors": [
    {
      "affs": [
        0,
        1
      ],
      "name": "Yuming Zhao"
    },
    {
      "affs": [
        2,
        3
      ],
      "name": "Lijie Su",
      "orcid": "0000-0002-9600-0229"
    },
    {
      "affs": [
        2,
        3
      ],
      "name": "Yang Yang"
    },
    {
      "affs": [
        0,
        1
      ],
      "name": "Gongshu Wang",
      "orcid": "0000-0003-1766-0630"
    }
  ],
  "bibtex": "https://research.draconitic.com/paper/bzxs3e4sqzzc1.bib",
  "cited_by": 0,
  "doi": "10.3390/math14224211",
  "fulltext_url": null,
  "id": "bzxs3e4sqzzc1",
  "issns": [
    "2227-7390"
  ],
  "landing_url": "https://www.mdpi.com/2227-7390/14/22/4211",
  "language": null,
  "licence": "CC-BY-4.0",
  "licence_label": "CC BY 4.0",
  "licence_source": "article",
  "licence_url": "https://creativecommons.org/licenses/by/4.0/",
  "metadata_licence": null,
  "native_subjects": [],
  "openalex": null,
  "pdf_url": null,
  "pmcid": null,
  "pmid": null,
  "published": "2026-11-16",
  "publisher": "MDPI AG",
  "ris": "https://research.draconitic.com/paper/bzxs3e4sqzzc1.ris",
  "sources": [
    {
      "first_seen": "2026-11-17T00:20:59Z",
      "native_id": "10.3390/math14224211",
      "source": "crossref",
      "url": "https://www.mdpi.com/2227-7390/14/22/4211"
    }
  ],
  "subjects": [
    {
      "field": "mathematics",
      "origin": "issn:2227-7390",
      "subfield": "general"
    }
  ],
  "title": "Production Planning in the Steel Industry and Its Downstream Manufacturers: A Review of Models and Solution Approaches",
  "title_text": "Production Planning in the Steel Industry and Its Downstream Manufacturers: A Review of Models and Solution Approaches",
  "type": "peer-reviewed",
  "updated_at": "2026-11-18T00:20:57Z",
  "url": "https://research.draconitic.com/paper/bzxs3e4sqzzc1",
  "venue": "Mathematics",
  "versions": []
}