BOLT: Multi-Bottleneck Bound-Guided Learning for Flexible Job-Shop Scheduling with Time Lags and Resource-Coupled Transport

Abstract

Flexible job-shop scheduling becomes resource-coupled when a scarce vehicle fleet moves jobs between stations, because the schedule sets the transport waits. BOLT (bound-oriented learning for transport-coupled scheduling) builds a lower bound from chain, machine-capacity, and fleet-capacity relaxations. The bound equals the makespan at termination, so its per-step changes form a reward that sums to a constant minus the makespan. Because it never exceeds the attainable makespan, each candidate's bound increase is a proven rise of the makespan floor, which the policy reads as a price. The root bound certifies a completed schedule's suboptimality gap without a solver. On industry-motivated 10-module prefabricated-construction instances, explicit transport coupling outperforms a transport-penalty policy in every tested cell where loaded moves occupy at least 66% of fleet time and in none at or below 56%. Across five zero-shot 50- and 80-module production batches, BOLT outperforms the best dispatching-rule pair on four and the penalty policy on the three with long moves. In the three-vehicle 80-module batch, its mean makespan is 13.0% below the best pair and 4.2% below an hour-budget constraint-programming solver whose proven gap averages 34%. BOLT decides in 2.3-5.9 ms per event on one processor core and re-plans a disruption in seconds.

Related

  1. SLAB: Time-Lag-Aware Deep Reinforcement Learning for Flexible Job-Shop Scheduling in PPVC Module Factories
    Ziheng Zhang, Dhivya Dharshini Kannan, Wei Zhang
    arXivPreprintCC BY 4.0Full textOptimisation & controlarXiv
  2. Optimization method for flexible scheduling of digital twin industrial loads based on load side potential elasticity
    Liu Juan, Zhao Shuang, Li Yan +3
    Diance yu yibiaoPeer-reviewedCC BY-NCFull textGeneral mathematicsDOAJ
  3. Automated Priority Rule Design for the Resource-Constrained Project Scheduling Problem: A Large Language Model-Guided Population-Based Search
    Jingyu Luo, Mario Vanhoucke, José Coelho
    arXivPreprintCC BY-NC-ND 4.0Full textOptimisation & controlarXiv
  4. Joint Flexible Beamforming, Resource Allocation, and Task Buffering for Movable-Antenna Enabled MEC Systems
    Hao Wang, Chunjie Wang, Lingtong Ma +5
    arXivPreprintarXiv licenceFull textGeneral mathematicsarXiv
  5. Combining optimal low emission zones scheduling and electric vehicle purchase incentives for transport policy backcasting
    Asmae Alami, Vinith Lakshmanan, Antonio Sciarretta
    HALPreprintCC BY 4.0Full textOptimisation & controlHAL
BibTeX
@misc{zhang2026bolt,
  title = {{BOLT: Multi-Bottleneck Bound-Guided Learning for Flexible Job-Shop Scheduling with Time Lags and Resource-Coupled Transport}},
  author = {Ziheng Zhang and Wei Zhang and Yunyi Zhao and Zuming Liu and Wei Zhou and Boon Ping Gan},
  howpublished = {arXiv},
  year = {2026},
  month = oct,
  doi = {10.48550/arxiv.2610.22433},
  eprint = {2610.22433},
  archivePrefix = {arXiv},
  url = {https://arxiv.org/abs/2610.22433},
  note = {CC BY 4.0},
}
RIS
TY  - UNPB
TI  - BOLT: Multi-Bottleneck Bound-Guided Learning for Flexible Job-Shop Scheduling with Time Lags and Resource-Coupled Transport
AU  - Ziheng Zhang
AU  - Wei Zhang
AU  - Yunyi Zhao
AU  - Zuming Liu
AU  - Wei Zhou
AU  - Boon Ping Gan
PY  - 2026
DA  - 2026/10/15
PB  - arXiv
DO  - 10.48550/arxiv.2610.22433
UR  - https://arxiv.org/abs/2610.22433
AB  - Flexible job-shop scheduling becomes resource-coupled when a scarce vehicle fleet moves jobs between stations, because the schedule sets the transport waits. BOLT (bound-oriented learning for transport-coupled scheduling) builds a lower bound from chain, machine-capacity, and fleet-capacity relaxations. The bound equals the makespan at termination, so its per-step changes form a reward that sums to a constant minus the makespan. Because it never exceeds the attainable makespan, each candidate's bound increase is a proven rise of the makespan floor, which the policy reads as a price. The root bound certifies a completed schedule's suboptimality gap without a solver. On industry-motivated 10-module prefabricated-construction instances, explicit transport coupling outperforms a transport-penalty policy in every tested cell where loaded moves occupy at least 66% of fleet time and in none at or below 56%. Across five zero-shot 50- and 80-module production batches, BOLT outperforms the best dispatching-rule pair on four and the penalty policy on the three with long moves. In the three-vehicle 80-module batch, its mean makespan is 13.0% below the best pair and 4.2% below an hour-budget constraint-programming solver whose proven gap averages 34%. BOLT decides in 2.3-5.9 ms per event on one processor core and re-plans a disruption in seconds.
ER  -