Multiobjective Γ-Robust Port Service-Capacity Planning Under Demand Uncertainty: Evidence from Chilean Vessel Movements

  1. 1Departamento de Ingeniería Industrial, Universidad Tecnológica Metropolitana, Santiago 7800002, Chile
  2. 2Departamento de Ingeniería Industrial y de Sistemas, Facultad de Ingeniería, Universidad de Tarapacá, Arica 1010069, Chile

Abstract

Port authorities must commit service capacity before monthly vessel demand is known. This study develops a multiobjective linear programming model based on Bertsimas–Sim Γ-robustness that jointly determines lower-cost regular capacity and higher-cost surge capacity. Monthly vessel-call uncertainty is represented by a budgeted uncertainty set, while an independent full-stress constraint imposes a minimum service level when all modeled upward deviations occur. A lexicographic ε-constraint procedure generates Pareto-optimal cost–shortage policies, and a balanced policy is selected by distance to the ideal point. The model is evaluated using 2020 data from 28 Chilean maritime authorities and validated with 2018–2022 data. At Γ = 0.10, the balanced policy allocates 647.0 regular and 207.5 surge units and achieves 98.41% full-stress service, with CostIdx 21% above the minimum-cost policy. The 15% deviation matches the historical year-ahead bound, and Γ = 0.10 is the smallest tested budget meeting the 95% out-of-sample target in three of four transitions. Full-stress reliability is the main CostIdx driver, whereas the base-capacity quantile mainly determines the capacity mix. Among alternatives meeting the same full-stress standard, the proposed model has the lowest CostIdx without requiring an assumed demand distribution.

Related

  1. Time to AC-t: When AC-transmission changes capacity expansion planning
    Lara Booth, Shiva Madadkhani, Ruaridh Macdonald +1
    arXivPreprintarXiv licenceFull textOptimisation & controlStatistical & nonlinear physicsarXiv
  2. LLM-Guided Transportation Hub Capacity Planning with Textual Business Inputs
    Xiaoyue Liu, Zheng Dong
    arXivPreprintCC BY 4.0Full textOptimisation & controlarXiv
  3. Solving Multiobjective Linear Set Optimization Problems
    Hsien-Chung Wu
    MathematicsPeer-reviewedCC BY 4.0General mathematicsCrossref
  4. Optimality and Exact Moment-SDP Formulations for Robust Two-Stage Convex Polynomial Multiobjective Optimization
    Yongqi Jiang, Zhe Hong, Chengmiao Yang
    arXivPreprintarXiv licenceFull textOptimisation & controlarXiv
  5. Expected Hypervolume Maximization for Multiobjective Optimization under Uncertainties
    Victor Trappler
    HALPreprintCC BY 4.0Full textOptimisation & controlStatisticsHAL
BibTeX
@article{duran2026multiobjective,
  title = {{Multiobjective Γ-Robust Port Service-Capacity Planning Under Demand Uncertainty: Evidence from Chilean Vessel Movements}},
  author = {Claudia Durán and Amir Karbassi Yazdi and Sebastián Bastías},
  journal = {Mathematics},
  year = {2026},
  month = oct,
  doi = {10.3390/math14213970},
  url = {https://www.mdpi.com/2227-7390/14/21/3970},
  note = {CC BY 4.0},
}
RIS
TY  - JOUR
TI  - Multiobjective Γ-Robust Port Service-Capacity Planning Under Demand Uncertainty: Evidence from Chilean Vessel Movements
AU  - Claudia Durán
AU  - Amir Karbassi Yazdi
AU  - Sebastián Bastías
PY  - 2026
DA  - 2026/10/30
JO  - Mathematics
DO  - 10.3390/math14213970
UR  - https://www.mdpi.com/2227-7390/14/21/3970
AB  - Port authorities must commit service capacity before monthly vessel demand is known. This study develops a multiobjective linear programming model based on Bertsimas–Sim Γ-robustness that jointly determines lower-cost regular capacity and higher-cost surge capacity. Monthly vessel-call uncertainty is represented by a budgeted uncertainty set, while an independent full-stress constraint imposes a minimum service level when all modeled upward deviations occur. A lexicographic ε-constraint procedure generates Pareto-optimal cost–shortage policies, and a balanced policy is selected by distance to the ideal point. The model is evaluated using 2020 data from 28 Chilean maritime authorities and validated with 2018–2022 data. At Γ = 0.10, the balanced policy allocates 647.0 regular and 207.5 surge units and achieves 98.41% full-stress service, with CostIdx 21% above the minimum-cost policy. The 15% deviation matches the historical year-ahead bound, and Γ = 0.10 is the smallest tested budget meeting the 95% out-of-sample target in three of four transitions. Full-stress reliability is the main CostIdx driver, whereas the base-capacity quantile mainly determines the capacity mix. Among alternatives meeting the same full-stress standard, the proposed model has the lowest CostIdx without requiring an assumed demand distribution.
SN  - 2227-7390
ER  -