Risk-Informed Path Planning: Collision and Grounding Avoidance Application for Autonomous Surface Vessels
Abstract
Maritime Autonomous Surface Ships (MASS) must demonstrate safety before and during operations, necessitating online risk assessment to guide decision-making at sea. This paper presents a risk-informed Rapidly Exploring Random Tree Star (RRT*) path planner that integrates a Bayesian Belief Network (BBN) as an online risk model. The BBN evaluates the probability and severity distribution of hazardous events, which are aggregated into a bounded scalar risk index. During the search, this risk index is evaluated at sample points along candidate edges. The planner optimizes a composite cost function comprising path distance, heading change penalties, and accumulated risk, subject to a hard constraint enforcing a risk acceptance limit. Each search tree vertex stores the BBN posterior at its state, enabling the tree to function as an explainable risk map for individual hazards. We define design requirements for the BBN to serve as the risk model in this context and introduce a runtime model that translates replanning deadlines into strict limits on single risk calculation times. The planner is demonstrated in a simulated harbor entry scenario involving collision and grounding hazards. Measured run times validate that the planner operates within the computational bounds predicted by the runtime model for a single replanning cycle.
Related
- Contraction Containment in Labeled Trees: Support Counts, Collision Cores, and Star Avoidance
- Averting `Gravity': Launch Control and the Limits of Collision Avoidance in Low Earth Orbit Operations
- Aerodynamic Collision Avoidance Manoeuvres in Very Low Earth Orbit: Exploiting Lift for Short Warning Times and Reduced Orbital Decay
- Uniform Exponential Attractors for Non-Autonomous Dynamical Systems and an Application to the damped hyperbolic equation with sub-quintic growth
- Operator splitting methods for non-autonomous evolution equations comprising three parts, with application to the Bloch-Torrey equation of MRI
BibTeX
@misc{gezer2026riskinformed,
title = {{Risk-Informed Path Planning: Collision and Grounding Avoidance Application for Autonomous Surface Vessels}},
author = {Emir Cem Gezer and Ozan Kaya and Ingrid B. Utne and Roger Skjetne},
howpublished = {arXiv},
year = {2026},
month = nov,
doi = {10.48550/arxiv.2611.32760},
eprint = {2611.32760},
archivePrefix = {arXiv},
url = {https://arxiv.org/abs/2611.32760},
note = {CC BY-SA 4.0},
}
RIS
TY - UNPB
TI - Risk-Informed Path Planning: Collision and Grounding Avoidance Application for Autonomous Surface Vessels
AU - Emir Cem Gezer
AU - Ozan Kaya
AU - Ingrid B. Utne
AU - Roger Skjetne
PY - 2026
DA - 2026/11/24
PB - arXiv
DO - 10.48550/arxiv.2611.32760
UR - https://arxiv.org/abs/2611.32760
AB - Maritime Autonomous Surface Ships (MASS) must demonstrate safety before and during operations, necessitating online risk assessment to guide decision-making at sea. This paper presents a risk-informed Rapidly Exploring Random Tree Star (RRT*) path planner that integrates a Bayesian Belief Network (BBN) as an online risk model. The BBN evaluates the probability and severity distribution of hazardous events, which are aggregated into a bounded scalar risk index. During the search, this risk index is evaluated at sample points along candidate edges. The planner optimizes a composite cost function comprising path distance, heading change penalties, and accumulated risk, subject to a hard constraint enforcing a risk acceptance limit. Each search tree vertex stores the BBN posterior at its state, enabling the tree to function as an explainable risk map for individual hazards. We define design requirements for the BBN to serve as the risk model in this context and introduce a runtime model that translates replanning deadlines into strict limits on single risk calculation times. The planner is demonstrated in a simulated harbor entry scenario involving collision and grounding hazards. Measured run times validate that the planner operates within the computational bounds predicted by the runtime model for a single replanning cycle.
ER -