Peer-reviewedCC BYMaterials (Basel, Switzerland)
Optimization of the Preparation Process and Laboratory Performance of Dry Process SBS/Crumb Rubber Composite Modified Asphalt Mixtures
- 1School of Traffic & Logistics Engineering, , Urumqi 830052, China; (A.A.); (Z.L.);
- 2Xinjiang Transportation Investment and Construction Management Co., Ltd., Urumqi 830000, China
Related
- Performance Evaluation of In Situ Prepolymerized TPU/SMC Composite-Modified Asphalt Mixtures with Aggregate Structure Optimization
- Modified micro-pulling-down method for preparation of phosphor–glass composite scintillators
- MnO2/g-C3N4/PPy Ternary Composite for Congo Red Adsorption from Water: Preparation and Comparative Performance
- Preparation and Properties of Deep Eutectic Solvent-Modified Soy Protein and Soy Protein–Chitosan Composite Films
- Preparation of Itaconic Acid-Modified Guar Gum Composite Hydrogel for Water Retention in Mine Ecological Restoration.
BibTeX
@article{aili2026optimization,
title = {{Optimization of the Preparation Process and Laboratory Performance of Dry Process SBS/Crumb Rubber Composite Modified Asphalt Mixtures}},
author = {Aikeranmu Aili and Zunqing Liu and Jian Sun and Renzhe Lei and Wei Wan and Haojie Ji},
journal = {Materials (Basel, Switzerland)},
year = {2026},
month = oct,
url = {https://europepmc.org/article/PMC/PMC13706685},
note = {CC BY},
}
RIS
TY - JOUR
TI - Optimization of the Preparation Process and Laboratory Performance of Dry Process SBS/Crumb Rubber Composite Modified Asphalt Mixtures
AU - Aikeranmu Aili
AU - Zunqing Liu
AU - Jian Sun
AU - Renzhe Lei
AU - Wei Wan
AU - Haojie Ji
PY - 2026
DA - 2026/10/01
JO - Materials (Basel, Switzerland)
UR - https://europepmc.org/article/PMC/PMC13706685
SN - 1996-1944
ER -