Skip to content
DraconiticResearch
Search Sources API
276,906 studies31 sourcesUpdated 27 min ago
PreprintCC BY 4.0arXiv

Optimal last-iterate rates for the projected decentralized stochastic subgradient method

Abstract

We study the projected decentralized stochastic subgradient (PDSG) method for minimizing the average of convex, possibly nonsmooth local objectives over a common closed convex constraint set and a fixed connected undirected network. We focus on the finite-time expected suboptimality of the last local iterate generated at each node, which is the actual output locally available without time averaging or network averaging. Under the standard stepsizes αt=α/√t and αt=2/(μt), we establish 𝒪(log T/√T) and 𝒪(log T/T) last-local-iterate rates for PDSG when each local objective is convex and the aggregate objective is strongly convex, respectively. To eliminate the logarithmic loss, we introduce a general horizon-dependent stepsize framework, termed cooldown stepsize, that combines a base stepsize with segmentwise scaling over a multistage partition and includes the dyadic construction (Jain et al, SIAM J. Optim., 2021) as a special case. For adapting to decentralized settings, we propose a long-range variation condition to make the stepsize schedule compatible with network contraction. Under this cooldown stepsize, we obtain 𝒪(1/√T) and 𝒪(1/T) last-local-iterate rates for PDSG in both problem classes, matching the optimal centralized dependence on T. Experiments on a lower-bound instance and constrained hinge-loss problems illustrate the predicted terminal behavior of local iterates and the control of consensus error under the cooldown stepsize.

Related

  1. The Last Iterate of the Projected Stochastic Subgradient Method Pays a Logarithm, Even in Dimension One
    Guglielmo Beretta, Tommaso Cesari, Roberto Colomboni
    arXivPreprintarXiv licenceFull textOptimisation & controlarXiv
  2. Sharp Last-Iterate Bounds for the Stochastic subGradient Method
    Guglielmo Beretta, Tommaso Cesari, Roberto Colomboni +1
    arXivPreprintarXiv licenceFull textOptimisation & controlarXiv
  3. A stochastic subgradient method with optimal failure exponent
    Bart P. G. van Parys
    arXivPreprintCC BY-SA 4.0Full textOptimisation & controlStatisticsarXiv
  4. Optimal Last-Iterate Bounds for Nonexpansive Stochastic Approximation
    Ramanan Tamizholi, Siddharth Chandak, Rahul Singh
    arXivPreprintCC BY 4.0Full textOptimisation & controlarXiv
  5. A Minimax Analysis of the Last Iterate of the SubGradient Method in Finite Dimension
    Guglielmo Beretta, Tommaso Cesari, Roberto Colomboni +1
    arXivPreprintarXiv licenceFull textOptimisation & controlarXiv
BibTeX
@misc{wu2026optimal,
  title = {{Optimal last-iterate rates for the projected decentralized stochastic subgradient method}},
  author = {Hao Wu and Chao Yin and Yuhong Dai and Liping Wang},
  howpublished = {arXiv},
  year = {2026},
  month = nov,
  doi = {10.48550/arxiv.2611.11992},
  eprint = {2611.11992},
  archivePrefix = {arXiv},
  url = {https://arxiv.org/abs/2611.11992},
  note = {CC BY 4.0},
}
RIS
TY  - UNPB
TI  - Optimal last-iterate rates for the projected decentralized stochastic subgradient method
AU  - Hao Wu
AU  - Chao Yin
AU  - Yuhong Dai
AU  - Liping Wang
PY  - 2026
DA  - 2026/11/09
PB  - arXiv
DO  - 10.48550/arxiv.2611.11992
UR  - https://arxiv.org/abs/2611.11992
AB  - We study the projected decentralized stochastic subgradient (PDSG) method for minimizing the average of convex, possibly nonsmooth local objectives over a common closed convex constraint set and a fixed connected undirected network. We focus on the finite-time expected suboptimality of the last local iterate generated at each node, which is the actual output locally available without time averaging or network averaging. Under the standard stepsizes α_t=α/√t and α_t=2/(μt), we establish 𝒪(log T/√T) and 𝒪(log T/T) last-local-iterate rates for PDSG when each local objective is convex and the aggregate objective is strongly convex, respectively. To eliminate the logarithmic loss, we introduce a general horizon-dependent stepsize framework, termed cooldown stepsize, that combines a base stepsize with segmentwise scaling over a multistage partition and includes the dyadic construction (Jain et al, SIAM J. Optim., 2021) as a special case. For adapting to decentralized settings, we propose a long-range variation condition to make the stepsize schedule compatible with network contraction. Under this cooldown stepsize, we obtain 𝒪(1/√T) and 𝒪(1/T) last-local-iterate rates for PDSG in both problem classes, matching the optimal centralized dependence on T. Experiments on a lower-bound instance and constrained hinge-loss problems illustrate the predicted terminal behavior of local iterates and the control of consensus error under the cooldown stepsize.
ER  -