A Review of Measurement System Uncertainty Handoffs Across the Manufacturing Decision Lifecycle
Abstract
Measurement systems generate uncertain information that downstream manufacturing decisions often consume as if fixed. This structured integrative review examines how measurement error, uncertainty, GR\&R estimates, calibration evidence, and drift information are handed off into capability inference, retrospective Phase I reference estimation, prospective Phase II monitoring, operational action, and requalification. Studies are compared by the upstream uncertain object, whether it is known, calibrated, or estimated, its propagation mechanism, the downstream decision, and the validation boundary. The synthesis distinguishes recorded production data from latent-process targets: measurement-system information calibrates limits, uncertainty statements, replication, guard bands, or losses, but does not reveal the realized random error in an individual record. Within the retained literature, measurement-to-capability and measurement-to-monitoring mechanisms are more extensively represented by model-based studies, whereas prospective evidence is thinner where statistical results must support source attribution, cost-sensitive action, and requalification. A decision-handoff spine separates measurement generation, statistical inference, and operational validation so that capability, stability, attribution, and intervention effectiveness are not conflated. The review is integrative rather than exhaustive. Its contribution is an auditable measurement-science framework that preserves provenance, information status, validity conditions, and downstream use while identifying claims that are model-supported, conditionally calibrated, or not yet operationally validated.
Related
- Uncertainty quantification of fatigue initiation life for powder bed fusion metal additive manufacturing
- A Continual Validation, Updating, and Decision-Making Framework for Self-Adaptive Digital Twins: A Case Study in Additive Manufacturing
- Generalized Semi-Infinite Programming for Robust Optimal Control with Decision-Dependent Uncertainty
- A general method for estimating reliability using Bayesian Measurement Uncertainty
- Aggregation Consistency in collective decision-making under uncertainty
BibTeX
@misc{jiang2026review,
title = {{A Review of Measurement System Uncertainty Handoffs Across the Manufacturing Decision Lifecycle}},
author = {Fei Jiang and Lei Yang},
howpublished = {arXiv},
year = {2026},
month = nov,
doi = {10.48550/arxiv.2611.11743},
eprint = {2611.11743},
archivePrefix = {arXiv},
url = {https://arxiv.org/abs/2611.11743},
}
RIS
TY - UNPB
TI - A Review of Measurement System Uncertainty Handoffs Across the Manufacturing Decision Lifecycle
AU - Fei Jiang
AU - Lei Yang
PY - 2026
DA - 2026/11/09
PB - arXiv
DO - 10.48550/arxiv.2611.11743
UR - https://arxiv.org/abs/2611.11743
AB - Measurement systems generate uncertain information that downstream manufacturing decisions often consume as if fixed. This structured integrative review examines how measurement error, uncertainty, GR\&R estimates, calibration evidence, and drift information are handed off into capability inference, retrospective Phase I reference estimation, prospective Phase II monitoring, operational action, and requalification. Studies are compared by the upstream uncertain object, whether it is known, calibrated, or estimated, its propagation mechanism, the downstream decision, and the validation boundary. The synthesis distinguishes recorded production data from latent-process targets: measurement-system information calibrates limits, uncertainty statements, replication, guard bands, or losses, but does not reveal the realized random error in an individual record. Within the retained literature, measurement-to-capability and measurement-to-monitoring mechanisms are more extensively represented by model-based studies, whereas prospective evidence is thinner where statistical results must support source attribution, cost-sensitive action, and requalification. A decision-handoff spine separates measurement generation, statistical inference, and operational validation so that capability, stability, attribution, and intervention effectiveness are not conflated. The review is integrative rather than exhaustive. Its contribution is an auditable measurement-science framework that preserves provenance, information status, validity conditions, and downstream use while identifying claims that are model-supported, conditionally calibrated, or not yet operationally validated.
ER -