Uncertainty-aware bilevel energy storage planning for active distribution networks: A fixed-topology DistFlow-based MISOCP framework with voltage-security assessment

  1. 1School of Energy and Electrical Engineering, Qinghai University, Xining, Qinghai, China
  2. 2Qinghai Key Lab of Efficient Utilization of Clean Energy, Qinghai University, Xining, Qinghai, China

Abstract

Historical renewable-load variability, voltage-security risk, and investment-operation coupling can materially change the assessed value of distribution-level energy storage. This study develops an uncertainty-aware bilevel energy storage system (ESS) planning framework in which the upper level selects a discrete siting-sizing-duration plan and the lower level solves a fixed-topology, multi-scenario mixed-integer second-order cone program (MISOCP) in which the network physics are represented by a DistFlow-SOCP formulation. An ESS-aware topology robustness check is further introduced to examine whether ESS-induced topology changes affect the planning conclusions obtained under the common-topology comparison. Complete daily load, photovoltaic, and wind observations from Denmark in 2016 and 2017 are represented as joint 72-dimensional trajectories. Input-risk-stratified historical-day reduction is examined for K = 3, 5, 10, and 20, with K = 10 used for the principal 33-bus study and K = 20 used as a higher-fidelity scenario-set check. Exhaustive evaluation of 211 alternatives identifies a 1.00 MW/ 2.00 MWh ESS at bus 24. Under K10 and the baseline fixed topology, the proposed design reduces daily TOTEX from 73,151.02 to 51,826.24 CNY/day (29.2%) relative to No ESS, raises the minimum voltage from 0.94138 to 0.95405 p.u., and reduces cumulative undervoltage exposure from 0.013528 to 0.001740 p.u.·h. Cross-year and seven-day chronological tests retain the economic and security pattern. On the released 240-bus feeder, the reference design improves voltage exposure, loading, and losses at a small incremental economic cost. These results show that historical tail conditions, common-topology attribution, and physical security metrics are important for auditable ESS planning.

Related

  1. Integration of ecological connectivity assessment into biodiversity-sensitive urban planning: modelling ecological impacts of residential development in planned urbanization zones in western Lyon (France)
    Marc Bourgeois
    Journal of Environmental ManagementPeer-reviewedCC BY 4.0Full textEnvironmental science & pollutionHAL
  2. Minimizing total costs for distribution power grids considering harmonics and uncertainty of wind speed and solar radiation
    Le Chi Kien, Nguyen Dinh Phu, Thang Trung Nguyen +2
    PLOS OnePeer-reviewedCC BY 4.0Full textAtmospheric science & meteorologyPLOS
  3. Occurrence, distribution and risk assessment of pharmaceuticals and personal care products in Djibouti aquifer
    Abdillahi Elmi Adaneh, Pascal Wong-Wah-Chung, Mohamed Osman Awaleh +4
    Environmental Science and Pollution ResearchPeer-reviewedLicence not statedFull text1 citedAnalytical chemistryEnvironmental science & pollutionHAL
  4. Modelling spatial trade-offs in urban sub-centre planning: A prospective scenario framework linking land value capture and residential welfare
    Tianren Yang
    CitiesPeer-reviewedCC BYFull text11 citedEnvironmental science & pollutionOpenAlex
  5. Heavy metal contamination and risk assessment with uncertainty analysis in agricultural soils at a rural–urban interface
    Fang Xia, Xiao Yan, Changsheng Jin +2
    Scientific ReportsPeer-reviewedCC BY 4.0Environmental science & pollutionCrossref
BibTeX
@article{miao2026uncertaintyaware,
  title = {{Uncertainty-aware bilevel energy storage planning for active distribution networks: A fixed-topology DistFlow-based MISOCP framework with voltage-security assessment}},
  author = {Zhenhua Miao and Ziyan Li and Yongjie Wang},
  journal = {PLOS One},
  year = {2026},
  month = oct,
  doi = {10.1371/journal.pone.0353192},
  url = {https://doi.org/10.1371/journal.pone.0353192},
  note = {CC BY 4.0},
}
RIS
TY  - JOUR
TI  - Uncertainty-aware bilevel energy storage planning for active distribution networks: A fixed-topology DistFlow-based MISOCP framework with voltage-security assessment
AU  - Zhenhua Miao
AU  - Ziyan Li
AU  - Yongjie Wang
PY  - 2026
DA  - 2026/10/09
JO  - PLOS One
DO  - 10.1371/journal.pone.0353192
UR  - https://doi.org/10.1371/journal.pone.0353192
AB  - Historical renewable-load variability, voltage-security risk, and investment-operation coupling can materially change the assessed value of distribution-level energy storage. This study develops an uncertainty-aware bilevel energy storage system (ESS) planning framework in which the upper level selects a discrete siting-sizing-duration plan and the lower level solves a fixed-topology, multi-scenario mixed-integer second-order cone program (MISOCP) in which the network physics are represented by a DistFlow-SOCP formulation. An ESS-aware topology robustness check is further introduced to examine whether ESS-induced topology changes affect the planning conclusions obtained under the common-topology comparison. Complete daily load, photovoltaic, and wind observations from Denmark in 2016 and 2017 are represented as joint 72-dimensional trajectories. Input-risk-stratified historical-day reduction is examined for K = 3, 5, 10, and 20, with K = 10 used for the principal 33-bus study and K = 20 used as a higher-fidelity scenario-set check. Exhaustive evaluation of 211 alternatives identifies a 1.00 MW/ 2.00 MWh ESS at bus 24. Under K10 and the baseline fixed topology, the proposed design reduces daily TOTEX from 73,151.02 to 51,826.24 CNY/day (29.2%) relative to No ESS, raises the minimum voltage from 0.94138 to 0.95405 p.u., and reduces cumulative undervoltage exposure from 0.013528 to 0.001740 p.u.·h. Cross-year and seven-day chronological tests retain the economic and security pattern. On the released 240-bus feeder, the reference design improves voltage exposure, loading, and losses at a small incremental economic cost. These results show that historical tail conditions, common-topology attribution, and physical security metrics are important for auditable ESS planning.
SN  - 1932-6203