Skip to content
DraconiticResearch
Search Sources API
276,906 studies31 sourcesUpdated 38 min ago
PreprintCC BY 4.0arXiv

Repairing actuator schedules under graph constraints

Abstract

We consider a discrete-time linear system in which each actuator is assigned to one time slot. A graph H records which pairs of actuators cannot share a slot. We seek to remove conflicts by exchanging actuators between slots, while preserving all tail reachability spaces. These spaces describe the terminal corrections available from each time slot onward. We give a sufficient condition based on the number of exchanges that preserve the required bases. The condition guarantees repair from every compatible starting schedule. Two bounds for checking it use failed basis tests and dependent column selections. Each accepted exchange reduces the conflict count, so the procedure uses at most as many exchanges as there are initial conflicts. An explicit family with unequal rank increments admits repair when 3N>4Δ(H)+4, where Δ(H) is the largest number of forbidden partners of any actuator. We also give a family of two-slot examples with only one forbidden partner per actuator and two initial conflicts. The basis constraints force every strict improvement to move arbitrarily many actuators, although one exchange suffices without those constraints. A second example has a connected conflict graph and one initial conflict.

Related

  1. Beyond Ellipsoids: Semi-Algebraic Tightening for Chance Constraints Under Actuator Saturation
    Carlo Karam, Mirko Fiacchini, Matteo Tacchi-Bénard
    HALPreprintCC BY-NC-ND 4.0Full textOptimisation & controlHALarXiv
  2. Admissibility-Preserving Control for Block Strict-Feedback Systems Under Time-Varying Asymmetric Actuator and State Constraints
    Saurabh Kumar, Lohitvel Gopikannan, Shashi Ranjan Kumar +1
    arXivPreprintCC BY-NC-ND 4.0Full textDynamical systemsarXiv
  3. Gain-Scheduled H∞ Attitude Control of a 6U CubeSat Under Inertia Uncertainty and Actuator Constraints
    Aslı Durmuşoğlu
    MathematicsPeer-reviewedCC BY 4.0General mathematicsCrossref
  4. Exponential random graph models with soft clique constraints
    Yasmin Tousinejad, Vera Koponen
    arXivPreprintarXiv licenceFull textCombinatorics & discrete mathematicsProbabilityarXiv
  5. Minimizing the makespan in job shop scheduling under conflict graph constraints
    Nour Elhouda Tellache, Abdenour Azerine
    arXivPreprintarXiv licenceFull textOptimisation & controlarXiv
BibTeX
@misc{kedzierski2026repairing,
  title = {{Repairing actuator schedules under graph constraints}},
  author = {Dawid E. Kędzierski and Piotr Krasoń},
  howpublished = {arXiv},
  year = {2026},
  month = nov,
  doi = {10.48550/arxiv.2611.19291},
  eprint = {2611.19291},
  archivePrefix = {arXiv},
  url = {https://arxiv.org/abs/2611.19291},
  note = {CC BY 4.0},
}
RIS
TY  - UNPB
TI  - Repairing actuator schedules under graph constraints
AU  - Dawid E. Kędzierski
AU  - Piotr Kraso{ń}
PY  - 2026
DA  - 2026/11/14
PB  - arXiv
DO  - 10.48550/arxiv.2611.19291
UR  - https://arxiv.org/abs/2611.19291
AB  - We consider a discrete-time linear system in which each actuator is assigned to one time slot. A graph H records which pairs of actuators cannot share a slot. We seek to remove conflicts by exchanging actuators between slots, while preserving all tail reachability spaces. These spaces describe the terminal corrections available from each time slot onward. We give a sufficient condition based on the number of exchanges that preserve the required bases. The condition guarantees repair from every compatible starting schedule. Two bounds for checking it use failed basis tests and dependent column selections. Each accepted exchange reduces the conflict count, so the procedure uses at most as many exchanges as there are initial conflicts. An explicit family with unequal rank increments admits repair when 3N>4Δ(H)+4, where Δ(H) is the largest number of forbidden partners of any actuator. We also give a family of two-slot examples with only one forbidden partner per actuator and two initial conflicts. The basis constraints force every strict improvement to move arbitrarily many actuators, although one exchange suffices without those constraints. A second example has a connected conflict graph and one initial conflict.
ER  -