Skip to content
DraconiticResearch
Search Sources API
203,948 studies31 sourcesUpdated 9 min ago
PreprintCC BY 4.0EarthArXiv

A rock-ice avalanche and the 2026 Bhote Koshi-Trishuli flood, Nepal

Abstract

On 26 August 2026 a rock-ice avalanche in the Langtang Himal produced a debris flow and flood that destroyed the Rasuwagadhi-Gyirong border crossing within minutes and reached Devghat about six hours later. We reconstruct the cascade with a depth-averaged mixture-flow model constrained by the seismic origin time, a CCTV frame, gauge outages in the gorge and downstream stage records. The model distinguishes rock, ice and water densities and conserves mass during melting. For a release of 35.4 million cubic metres with 20% ice, added at rest, the front reaches Gyirong Port at 390 s and Syabrubesi at 1050 s, within the working observation windows. Parameter comparisons favour low effective resistance within the tested source and terrain scenarios. Downstream routing selected using waveform errors gives stage rises of 8.94 m at Galchhi and 4.98 m at Kali Khola, compared with observed rises of about 8.8 and 5.6 m. Their model rise times of 1.85 and 4.77 h also fall within the observation windows. Without prescribing an additional outburst from a temporary landslide dam, the reconstruction reproduces the upper timing windows and broadly follows these two downstream hydrographs. The results support an avalanche-derived surge followed by valley-controlled redistribution and identify low effective resistance and lateral storage as controls within the adopted model.

Related

  1. A multi-source quantitative reconstruction of the 26 August 2026 Bhote Koshi rock-ice avalanche-debris-flow-flood cascade, Nepal
    Nischal Pokhrel, Tinisha Khatri
    EarthArXivPreprintCC BY 4.0Full textEnvironmental science & pollutionEarthArXiv
  2. Counterfactual Evaluation of a Satellite-Connected Multi-Sensor Early-Warning System During the 26 August 2026 Bhote Koshi–Trishuli Disaster
    Basanta Paudyal
    EarthArXivPreprintCC BY 4.0Full textEnvironmental science & pollutionEarthArXiv
  3. The 26 August 2026 Langtang Lirung ice–rock avalanche and its transboundary cascade: a multi-source observational reconstruction in the Bhote Koshi basin
    Donghua Xu
    EarthArXivPreprintCC BY 4.0Full text1 citedGeology & geochemistryHydrology & soilsEarthArXiv
  4. A cascade, not a flood: testing the competing accounts of the 26 August 2026 Lhende Khola–Bhote Koshi disaster
    Ishfaq Gujree
    EarthArXivPreprintCC BY 4.0Full text1 citedGeology & geochemistryHydrology & soilsEarthArXiv
  5. A steadily flowing glacier and no detectable precursor before the 11 October 2026 Budhi Gandaki rock–ice avalanche and flood, Nepal
    Ajay Kumar Sah
    EarthArXivPreprintCC BY 4.0Full textGeology & geochemistryEarthArXiv
BibTeX
@misc{park2026rockice,
  title = {{A rock-ice avalanche and the 2026 Bhote Koshi-Trishuli flood, Nepal}},
  author = {hyoseok park},
  howpublished = {EarthArXiv},
  year = {2026},
  month = sep,
  doi = {10.31223/x5250r},
  url = {https://eartharxiv.org/repository/view/14849/},
  note = {CC BY 4.0},
}
RIS
TY  - UNPB
TI  - A rock-ice avalanche and the 2026 Bhote Koshi-Trishuli flood, Nepal
AU  - hyoseok park
PY  - 2026
DA  - 2026/09/06
PB  - EarthArXiv
DO  - 10.31223/x5250r
UR  - https://eartharxiv.org/repository/view/14849/
AB  - On 26 August 2026 a rock-ice avalanche in the Langtang Himal produced a debris flow and flood that destroyed the Rasuwagadhi-Gyirong border crossing within minutes and reached Devghat about six hours later. We reconstruct the cascade with a depth-averaged mixture-flow model constrained by the seismic origin time, a CCTV frame, gauge outages in the gorge and downstream stage records. The model distinguishes rock, ice and water densities and conserves mass during melting. For a release of 35.4 million cubic metres with 20% ice, added at rest, the front reaches Gyirong Port at 390 s and Syabrubesi at 1050 s, within the working observation windows. Parameter comparisons favour low effective resistance within the tested source and terrain scenarios. Downstream routing selected using waveform errors gives stage rises of 8.94 m at Galchhi and 4.98 m at Kali Khola, compared with observed rises of about 8.8 and 5.6 m. Their model rise times of 1.85 and 4.77 h also fall within the observation windows. Without prescribing an additional outburst from a temporary landslide dam, the reconstruction reproduces the upper timing windows and broadly follows these two downstream hydrographs. The results support an avalanche-derived surge followed by valley-controlled redistribution and identify low effective resistance and lateral storage as controls within the adopted model.
ER  -