Assessing cost overrun in the saudi arabian building construction projects for value preservation

  1. 1Department of Civil Engineering, College of Engineering and Architecture, Umm Al-Qura University

Abstract

The pervasive issue of cost overruns remains a significant barrier to ensuring project success within budget and schedule constraints. While the causes of overruns are known, a major gap exists in providing validated, high-accuracy predictive tools for proactive expenditure control. This research addresses this gap by aiming to identify the most significant cost overrun factors in building construction projects and develop an accurate predictive model using advanced machine learning. The methodology involved collecting data via questionnaire surveys and interviews, assessing 49 pre-identified factors from industry experts. The Relative Importance Weight (RIW) method was used to prioritize these causes. Key findings revealed that 70% of the most significant factors were classified as internal project control deficiencies, including changes in scope and design, inadequate documentation, and poor site management. To achieve proactive forecasting, the study developed and systematically compared seven diverse Machine Learning (ML) architectures. The General Regression Neural Network (GRNN) was identified as the optimal model, achieving superior predictive performance with an average error (Mean Absolute Percentage Error, MAPE) of less than 3% and a correlation (R) of 0.95. The novel contribution of this work is the validated GRNN model, which transforms problem recognition into a reliable, actionable decision-support system for expenditure optimization and project value preservation in the construction sector.

Related

  1. Supervising Ethically: Applied Research Ethics Knowledge Among Supervisors of Medical Student Research Projects.
    Joanne Hart, Richmond Jeremy, Rajneesh Kaur
    Medical science educatorPeer-reviewedCC BYFull textEpidemiology & public healthEurope PMCPMC
  2. The "symbiosis" between high-quality register data and value-based health care and the role of local, national, and international registers in the development and promotion of value-based healthcare projects.
    Peter Cnudde, Ola Rolfson, Louisa Huxtable-Thomas
    BMC health services researchPeer-reviewedCC BYFull textEpidemiology & public healthEurope PMCDOAJ
  3. Beyond Fertility: Ethical and Psychosocial Dimensions of Fertility Preservation in Children and Adolescents
    Mira S Aridas, Kathryn Grive
    CureusPeer-reviewedCC BYFull textGeneral medicineEurope PMC
  4. Quality of Life After Organ Preservation in Rectal Cancer—Beyond Survival
    Chandler A. Annesi, Daniel I. Chu
    JAMA Network OpenPeer-reviewedCC BY 4.0OncologyCrossref
  5. Knee osteoarthritis management across the joint-preservation continuum: current evidence and future directions
    Joshua Kulpinski, Andrew Carusi, Michael Langworthy
    Frontiers in surgeryPeer-reviewedCC BYFull textSurgery & anaesthesiaEurope PMC
BibTeX
@article{mlybari2026assessing,
  title = {{Assessing cost overrun in the saudi arabian building construction projects for value preservation}},
  author = {Ehab A. Mlybari and Abdulaziz I. Al-Muaybid and Moussa S. Elbisy},
  journal = {Scientific Reports},
  year = {2026},
  month = jun,
  doi = {10.1038/s41598-026-41346-0},
  url = {https://doi.org/10.1038/s41598-026-41346-0},
  note = {CC BY},
}
RIS
TY  - JOUR
TI  - Assessing cost overrun in the saudi arabian building construction projects for value preservation
AU  - Ehab A. Mlybari
AU  - Abdulaziz I. Al-Muaybid
AU  - Moussa S. Elbisy
PY  - 2026
DA  - 2026/06/01
JO  - Scientific Reports
DO  - 10.1038/s41598-026-41346-0
UR  - https://doi.org/10.1038/s41598-026-41346-0
AB  - The pervasive issue of cost overruns remains a significant barrier to ensuring project success within budget and schedule constraints. While the causes of overruns are known, a major gap exists in providing validated, high-accuracy predictive tools for proactive expenditure control. This research addresses this gap by aiming to identify the most significant cost overrun factors in building construction projects and develop an accurate predictive model using advanced machine learning. The methodology involved collecting data via questionnaire surveys and interviews, assessing 49 pre-identified factors from industry experts. The Relative Importance Weight (RIW) method was used to prioritize these causes. Key findings revealed that 70% of the most significant factors were classified as internal project control deficiencies, including changes in scope and design, inadequate documentation, and poor site management. To achieve proactive forecasting, the study developed and systematically compared seven diverse Machine Learning (ML) architectures. The General Regression Neural Network (GRNN) was identified as the optimal model, achieving superior predictive performance with an average error (Mean Absolute Percentage Error, MAPE) of less than 3% and a correlation (R) of 0.95. The novel contribution of this work is the validated GRNN model, which transforms problem recognition into a reliable, actionable decision-support system for expenditure optimization and project value preservation in the construction sector.
SN  - 2045-2322
ER  -