Skip to content
DraconiticResearch
Search Sources API
276,906 studies31 sourcesUpdated 16 min ago
PreprintarXiv licencearXiv

A probabilistic analysis of the Brumadinho tailings dam-breach using uncertainty quantification and global sensitivity analysis

Abstract

On 25th January 2019, Dam B1 in Brumadinho, Brazil, suddenly collapsed and produced a catastrophic tailings flow with severe human, environmental and infrastructural consequences. Previous numerical back-analyses of the tailings flow have relied on deterministic approaches, which provide useful reference results but do not explicitly incorporate uncertainty associated to rupture hydrograph and tailings' physical properties. This work presents a probabilistic approach to study the tailings dam-breach flow caused by the rupture of Dam B1, focusing on the quantification and interpretation of the effects of input uncertainty on hazard-related hydrodynamical outputs. Deterministic data was obtained through HEC-RAS v6.6 by considering tailings as an one-phase Bingham fluid. The probabilistic framework combines dimensionality reduction, metamodeling and flooding classification to perform fast prediction of unexplored input scenarios. It allows to obtain data distributions that reflect output uncertainty and to estimate variance-based sensitivity indices to quantify the influence of input uncertainty over output variability. Results show that uncertainty is strongly dependent on time and spatial location. Hydrograph-related parameters mainly control the timing and magnitude of the early flow, whereas yield stress becomes more influential in regions associated with flow attenuation, spreading and possible arrest. Overall, the framework provides probabilistic hazard estimates and insights into the physical mechanisms governing the dynamics of tailings flow.

Related

  1. Rigorous uncertainty quantification of probabilistic AI weather forecasts with conformal prediction
    Anna Asch, Raphael Rossellini, Pedram Hassanzadeh +1
    arXiv (Cornell University)PreprintLicence not statedFull text8 citedAtmospheric science & meteorologyOpenAlex
  2. Advancing Near-Term Water Quality Forecasting with Explainable Machine Learning and Probabilistic Uncertainty Quantification
    Rohit Shukla, Cayelan C. Carey, Adrienne Breef-Pilz +1
    ACS ES&T waterPeer-reviewedCC BYFull textEnvironmental science & pollutionEurope PMC
  3. A Probabilistic Framework for Site-Specific Tropical Cyclone Loss Quantification and Reinsurance Optimization
    Kunal J. Rathore
    EarthArXivPreprintCC BY 4.0Full textEnvironmental science & pollutionEarthArXiv
  4. Uncertainty quantification for renewable energy generation from landfill methane
    Mohammadali Rasouli, Mehran Karimpour-Fard, Sandro Lemos Machado
    Scientific ReportsPeer-reviewedCC BY-NC-ND 4.0Full textEnvironmental science & pollutionCrossref
  5. Uncertainty-aware reservoir characterization using probabilistic seismic–petrophysical integration
    RODWAN A ELBAROUNI
    World Journal of Advanced Engineering Technology and SciencesPeer-reviewedCC BYFull text5 citedGeophysics & seismologyOpenAlex
BibTeX
@misc{sao2026probabilistic,
  title = {{A probabilistic analysis of the Brumadinho tailings dam-breach using uncertainty quantification and global sensitivity analysis}},
  author = {Yuri Taglieri Sáo and Geraldo de Freitas Maciel and Julian Cardoso Eleutério},
  howpublished = {arXiv},
  year = {2026},
  month = nov,
  doi = {10.48550/arxiv.2611.24172},
  eprint = {2611.24172},
  archivePrefix = {arXiv},
  url = {https://arxiv.org/abs/2611.24172},
}
RIS
TY  - UNPB
TI  - A probabilistic analysis of the Brumadinho tailings dam-breach using uncertainty quantification and global sensitivity analysis
AU  - Yuri Taglieri Sáo
AU  - Geraldo de Freitas Maciel
AU  - Julian Cardoso Eleutério
PY  - 2026
DA  - 2026/11/18
PB  - arXiv
DO  - 10.48550/arxiv.2611.24172
UR  - https://arxiv.org/abs/2611.24172
AB  - On 25th January 2019, Dam B1 in Brumadinho, Brazil, suddenly collapsed and produced a catastrophic tailings flow with severe human, environmental and infrastructural consequences. Previous numerical back-analyses of the tailings flow have relied on deterministic approaches, which provide useful reference results but do not explicitly incorporate uncertainty associated to rupture hydrograph and tailings' physical properties. This work presents a probabilistic approach to study the tailings dam-breach flow caused by the rupture of Dam B1, focusing on the quantification and interpretation of the effects of input uncertainty on hazard-related hydrodynamical outputs. Deterministic data was obtained through HEC-RAS v6.6 by considering tailings as an one-phase Bingham fluid. The probabilistic framework combines dimensionality reduction, metamodeling and flooding classification to perform fast prediction of unexplored input scenarios. It allows to obtain data distributions that reflect output uncertainty and to estimate variance-based sensitivity indices to quantify the influence of input uncertainty over output variability. Results show that uncertainty is strongly dependent on time and spatial location. Hydrograph-related parameters mainly control the timing and magnitude of the early flow, whereas yield stress becomes more influential in regions associated with flow attenuation, spreading and possible arrest. Overall, the framework provides probabilistic hazard estimates and insights into the physical mechanisms governing the dynamics of tailings flow.
ER  -