Geotechnically Informed Monitoring-Data Fusion and Gradient-Boosted Regression for Instrumented Driven Piles

  1. 1Ministry of Transportation of Ontario, Toronto, ON M9M 2L4, Canada
  2. 2Department of Civil and Environmental Engineering, University of Waterloo, Waterloo, ON N2L 3G1, Canada
  3. 3Geomechanics and Geotechnics, Institute of Geosciences, Kiel University, 24118 Kiel, Germany

Abstract

Long-term monitoring can test whether pile-design assumptions remain appropriate as consolidation and soil-pile load transfer develop after construction. This study combines records from three Ontario transportation projects: Ramsayville, Locha Creek, and Nash Road. The database contains 53,218 weekly movement records, 152 sensor channels, 1714 axial-load profiles, and ten instrumented piles. Baseline-referenced axial-force changes were interpreted together with pore pressure, ground and pile movement, soil-test results, pile geometry, load tests, and construction history. Conventional total-stress and effective-stress calculations were retained as engineering baselines, while gradient-boosted models were used to examine nonlinear residuals and the relative influence of measured inputs. A bounded cross-site mobilization relation achieved an in-sample RMSE of 100.0 kN (R2=0.71) and a leave-one-site-out RMSE of 110.2 kN. In a separate Ramsayville daily forecasting analysis, a seven-day moving average outperformed LightGBM and CatBoost, showing that greater model complexity did not improve short-term prediction. The confirmed cost of the full Ramsayville research monitoring program is CAD 678,700: CAD 267,200 for the test-pile program and CAD 411,500 for the production-pile program. A reduced regional seed-site program is estimated at CAD 225,700. At Locha Creek, the project reference exceeded the conditional 95% screening value by 7.9%, equivalent in cost to 2.30 m of installed pile length, or about CAD 919 per representative 29 m pile at CAD 400/m. The corrected break-even scale is approximately 246 similar piles. No screened reduction was supported at Ramsayville or Nash Road. The results define a monitoring-to-design framework that can identify both conservative and unconservative assumptions. Any design modification must still satisfy the governing geotechnical, structural, serviceability, drivability, group, founding, durability, and reliability requirements.

Related

  1. On The Linear Convergence of Bregman Proximal Gradient Methods with Applications to Kullback--Leibler regression
    Jonathan Chirinos-Rodríguez, Christian Daniele, Cédric Févotte +1
    HALPreprintLicence not statedOptimisation & controlHAL
  2. On the Gradient Heterogeneity Dynamics of Adversarially Robust Federated Regression
    Leonardo F. Toso, James Anderson, Nirupam Gupta +1
    arXivPreprintarXiv licenceFull textStatisticsarXiv
  3. Gradient descent reaches arbitrary accuracy in a fixed number of large steps on multiclass logistic regression
    Andreea-Alexandra Musat, Nicolas Boumal
    arXivPreprintarXiv licenceFull textOptimisation & controlarXiv
  4. Statistical and Privacy Guarantees for Deep M-Regression via Stochastic Gradient Langevin Dynamics
    Yeheng Ge, Jian Huang, Shuyuan Wu
    arXivPreprintarXiv licenceFull textStatisticsarXiv
  5. Minimax Rates for imperfect Physics-Informed Regression
    Nathan Doumèche
    HALPreprintCC BY 4.0Full textStatisticsHALarXiv
BibTeX
@article{sangiuliano2026geotechnically,
  title = {{Geotechnically Informed Monitoring-Data Fusion and Gradient-Boosted Regression for Instrumented Driven Piles}},
  author = {Tony Sangiuliano and Mohammad Zaid and Zarghaam Rizvi and Dipanjan Basu},
  journal = {Mathematics},
  year = {2026},
  month = oct,
  doi = {10.3390/math14193632},
  url = {https://www.mdpi.com/2227-7390/14/19/3632},
  note = {CC BY 4.0},
}
RIS
TY  - JOUR
TI  - Geotechnically Informed Monitoring-Data Fusion and Gradient-Boosted Regression for Instrumented Driven Piles
AU  - Tony Sangiuliano
AU  - Mohammad Zaid
AU  - Zarghaam Rizvi
AU  - Dipanjan Basu
PY  - 2026
DA  - 2026/10/08
JO  - Mathematics
DO  - 10.3390/math14193632
UR  - https://www.mdpi.com/2227-7390/14/19/3632
AB  - Long-term monitoring can test whether pile-design assumptions remain appropriate as consolidation and soil-pile load transfer develop after construction. This study combines records from three Ontario transportation projects: Ramsayville, Locha Creek, and Nash Road. The database contains 53,218 weekly movement records, 152 sensor channels, 1714 axial-load profiles, and ten instrumented piles. Baseline-referenced axial-force changes were interpreted together with pore pressure, ground and pile movement, soil-test results, pile geometry, load tests, and construction history. Conventional total-stress and effective-stress calculations were retained as engineering baselines, while gradient-boosted models were used to examine nonlinear residuals and the relative influence of measured inputs. A bounded cross-site mobilization relation achieved an in-sample RMSE of 100.0 kN (R2=0.71) and a leave-one-site-out RMSE of 110.2 kN. In a separate Ramsayville daily forecasting analysis, a seven-day moving average outperformed LightGBM and CatBoost, showing that greater model complexity did not improve short-term prediction. The confirmed cost of the full Ramsayville research monitoring program is CAD 678,700: CAD 267,200 for the test-pile program and CAD 411,500 for the production-pile program. A reduced regional seed-site program is estimated at CAD 225,700. At Locha Creek, the project reference exceeded the conditional 95% screening value by 7.9%, equivalent in cost to 2.30 m of installed pile length, or about CAD 919 per representative 29 m pile at CAD 400/m. The corrected break-even scale is approximately 246 similar piles. No screened reduction was supported at Ramsayville or Nash Road. The results define a monitoring-to-design framework that can identify both conservative and unconservative assumptions. Any design modification must still satisfy the governing geotechnical, structural, serviceability, drivability, group, founding, durability, and reliability requirements.
SN  - 2227-7390
ER  -