Skip to content
DraconiticResearch
Search Sources API
182,460 studies31 sourcesUpdated 24 min ago
Peer-reviewedCC BY 4.0Fractal and Fractional

Constraint-Embedded Fractal Self-Similar Generation of Synthetic Topologies for Receiving-End Power Grids with Rich Renewable Energy: A Hybrid Metaheuristic Approach

  1. 1Key Laboratory of Power System Intelligent Dispatch and Control of Ministry of Education, Shandong University, Jinan 250061, China
  2. 2State Grid Economic and Technological Research Institute Co., Ltd., Changping District, Beijing 102209, China
  3. 3National Key Laboratory of Power Grid Security, China Electric Power Research Institute Co., Ltd., Haidian District, Beijing 100192, China

Abstract

Fractal geometry offers a natural language for the self-similarity and scale invariance of power networks, yet future receiving-end grids shaped by high renewable penetration, high load density and large HVDC infeed have no historical counterpart. This paper formalizes the synthesis of such grids as a Constrained Fractal Iteration System (CFIS), in which synthetic topology is generated by the scale-progressive composition of three fractal operators, each coupling a spatial clustering/topology operator with an engineering constraint-projection operator. A hybrid metaheuristic realizes the operators through dynamic-weighted K-means (DWK-Means), social-learning particle swarm optimization (SL-PSO) and constraint-embedded 2-opt (CE-2-opt). On a provincial receiving-end grid at 162, 234, and 363 GW, the generated topologies are scale-invariant over a well-defined box-size range: the box-counting dimension rises from 1.675 to 1.800 with load and shows a clear voltage-layered hierarchy; the constrained dimension remains within 1.5% of the unconstrained value, showing that engineering feasibility costs almost no fractal quality. The 500 kV station set attains a correlation dimension of 1.81 versus 1.69 for the real existing grid, consistent with the interpretation of the synthetic grid as an idealized fractal upper bound. Short-circuit levels are brought within the 63 kA limit after correction, and renewable curtailment and load shedding remain zero; N-1 screening of all elements shows that the worst post-contingency loading falls from 98.5% at 162 GW to 91.4% at 363 GW, satisfying the thermal limits under single contingencies. Against classical topology generators built on the same node set, the proposed backbone attains full degree-two redundancy and a comparable fractal dimension with about 24% less line length, and an ablation of the redundancy bound shows that it, rather than the short-circuit limit, governs steady-state security at the low load scale.

Related

  1. A Constraint-Aware Generative Framework for Synthetic Origin-Destination Demand in Logistics Networks
    Leian Chen
    arXivPreprintarXiv licenceFull textStatisticsarXiv
  2. A mechanism-guided simulation framework for synthetic tax-risk data: Constraint validation and reproducible benchmarking
    Xiaojing Fan
    PLOS OnePeer-reviewedCC BY 4.0Full textCell biologyNeurosciencePLOS
  3. DagFlow AI: Agentic Synthetic Data Generation for Personalized Statistics Learning
    David Arthur, Ranjini Grove, Zaher Kmail +1
    arXivPreprintCC BY-NC-ND 4.0Full textStatisticsarXiv
  4. Synthetic Data Augmentation for Functional Data: Wasserstein Risk Bounds and Diffusion-Based Conditional Generation
    Yuhao Qi, Wenlin Dai, Xuehu Zhu
    arXivPreprintarXiv licenceFull textStatisticsarXiv
  5. Verifier-Guided Synthetic Augmentation for 3D Human Shape Generation
    Yuexuan Wu, Yang Xiang, Hamid Laga +3
    arXivPreprintarXiv licenceFull textStatisticsarXiv
BibTeX
@article{yu2026constraintembedded,
  title = {{Constraint-Embedded Fractal Self-Similar Generation of Synthetic Topologies for Receiving-End Power Grids with Rich Renewable Energy: A Hybrid Metaheuristic Approach}},
  author = {Yue Yu and Yifei Pan and Changgang Li and Shuolin Zhang and Jingyi Zhang and Yan Zhang and Libo Zhang},
  journal = {Fractal and Fractional},
  year = {2026},
  month = oct,
  doi = {10.3390/fractalfract10110756},
  url = {https://www.mdpi.com/2504-3110/10/11/756},
  note = {CC BY 4.0},
}
RIS
TY  - JOUR
TI  - Constraint-Embedded Fractal Self-Similar Generation of Synthetic Topologies for Receiving-End Power Grids with Rich Renewable Energy: A Hybrid Metaheuristic Approach
AU  - Yue Yu
AU  - Yifei Pan
AU  - Changgang Li
AU  - Shuolin Zhang
AU  - Jingyi Zhang
AU  - Yan Zhang
AU  - Libo Zhang
PY  - 2026
DA  - 2026/10/29
JO  - Fractal and Fractional
DO  - 10.3390/fractalfract10110756
UR  - https://www.mdpi.com/2504-3110/10/11/756
AB  - Fractal geometry offers a natural language for the self-similarity and scale invariance of power networks, yet future receiving-end grids shaped by high renewable penetration, high load density and large HVDC infeed have no historical counterpart. This paper formalizes the synthesis of such grids as a Constrained Fractal Iteration System (CFIS), in which synthetic topology is generated by the scale-progressive composition of three fractal operators, each coupling a spatial clustering/topology operator with an engineering constraint-projection operator. A hybrid metaheuristic realizes the operators through dynamic-weighted K-means (DWK-Means), social-learning particle swarm optimization (SL-PSO) and constraint-embedded 2-opt (CE-2-opt). On a provincial receiving-end grid at 162, 234, and 363 GW, the generated topologies are scale-invariant over a well-defined box-size range: the box-counting dimension rises from 1.675 to 1.800 with load and shows a clear voltage-layered hierarchy; the constrained dimension remains within 1.5% of the unconstrained value, showing that engineering feasibility costs almost no fractal quality. The 500 kV station set attains a correlation dimension of 1.81 versus 1.69 for the real existing grid, consistent with the interpretation of the synthetic grid as an idealized fractal upper bound. Short-circuit levels are brought within the 63 kA limit after correction, and renewable curtailment and load shedding remain zero; N-1 screening of all elements shows that the worst post-contingency loading falls from 98.5% at 162 GW to 91.4% at 363 GW, satisfying the thermal limits under single contingencies. Against classical topology generators built on the same node set, the proposed backbone attains full degree-two redundancy and a comparable fractal dimension with about 24% less line length, and an ablation of the redundancy bound shows that it, rather than the short-circuit limit, governs steady-state security at the low load scale.
SN  - 2504-3110
ER  -