Skip to content
DraconiticResearch
Search Sources API
182,549 studies31 sourcesUpdated 18 min ago
Peer-reviewedCC BY-NC-ND 4.0Proceedings of the National Academy of Sciences of the United States of America

Proof of the density threshold conjecture for pinwheel scheduling

  1. 1Research Institute for Mathematical Sciences, Kyoto University, Kyoto 606-8502, Japan

Abstract

In the pinwheel scheduling problem, each task i is associated with a positive integer ai called its period, and we want to (perpetually) schedule one task per day so that each task i is performed at least once every ai days. An obvious necessary condition for schedulability is that the density, defined as the sum of execution rates 1/ai, does not exceed 1. We prove that all instances with density not exceeding 5/6 are schedulable, as was conjectured by Chan and Chin in 1993. Like some of the known partial progress toward the conjecture, our proof involves computer search for schedules for a large but finite set of instances. A key idea in our reduction to these finite cases is to generalize the problem to fractional (noninteger) periods in an appropriate way. As byproducts of our ideas, we obtain a simple proof that every instance with two distinct periods and density at most 1 is schedulable, as well as a fast algorithm for the bamboo garden trimming problem with approximation ratio 4/3.

Related

  1. Nonlinear Dose–Response Association Between Exercise Intensity and Urinary Liver-Type Fatty Acid-Binding Protein in Young Men: A Piecewise Threshold Analysis
    International journal of molecular sciencesPeer-reviewedCC BYFull textGeneral biochemistryEurope PMC
  2. Type I and III interferons differentially encode inflammatory gene activation through threshold control of ISGF3 dynamics
    H. Dubon Martinez, R. Chettiyar, M. McAuley +1
    bioRxivPreprintAll rights reservedFull textMolecular biology & gene regulationbioRxiv
  3. Multivalent Scaffolding by XIST E-Repeats Tunes RNA Binding Protein Cooperativity and Lowers the Phase Separation Threshold
    B. Eusse, A. Vidal-Ceballos, A. K. Meyer +4
    bioRxivPreprintAll rights reservedFull textBiophysicsbioRxiv
  4. e^-2 Threshold for Bistability in Non-equilibrium Sorting of Biomolecular Condensates
    W. Chen, S. Pei, G. Yu
    bioRxivPreprintCC BY-NCFull textBiophysicsbioRxiv
  5. Why are some neurons spared in neurodegeneration? Cellular subtype identity maintenance as a candidate threshold-setting mechanism
    Dong Won Kim
    PLOS BiologyPeer-reviewedCC BY 4.0Full textMolecular biology & gene regulationCell biologyPLOSDOAJ
BibTeX
@article{kawamura2026proof,
  title = {{Proof of the density threshold conjecture for pinwheel scheduling}},
  author = {Akitoshi Kawamura},
  journal = {Proceedings of the National Academy of Sciences of the United States of America},
  year = {2026},
  month = aug,
  doi = {10.1073/pnas.2530214123},
  url = {https://doi.org/10.1073/pnas.2530214123},
  note = {CC BY-NC-ND 4.0},
}
RIS
TY  - JOUR
TI  - Proof of the density threshold conjecture for pinwheel scheduling
AU  - Akitoshi Kawamura
PY  - 2026
DA  - 2026/08/07
JO  - Proceedings of the National Academy of Sciences of the United States of America
DO  - 10.1073/pnas.2530214123
UR  - https://doi.org/10.1073/pnas.2530214123
AB  - In the pinwheel scheduling problem, each task i is associated with a positive integer ai called its period, and we want to (perpetually) schedule one task per day so that each task i is performed at least once every ai days. An obvious necessary condition for schedulability is that the density, defined as the sum of execution rates 1/ai, does not exceed 1. We prove that all instances with density not exceeding 5/6 are schedulable, as was conjectured by Chan and Chin in 1993. Like some of the known partial progress toward the conjecture, our proof involves computer search for schedules for a large but finite set of instances. A key idea in our reduction to these finite cases is to generalize the problem to fractional (noninteger) periods in an appropriate way. As byproducts of our ideas, we obtain a simple proof that every instance with two distinct periods and density at most 1 is schedulable, as well as a fast algorithm for the bamboo garden trimming problem with approximation ratio 4/3.
SN  - 0027-8424
SN  - 1091-6490
ER  -